Kitan Development Project - Sub Sea Equipment Supply

Project Owner: FMC Technologies Ltd
Project Value: -
Project Status: Open
Location: NT, Australia

Associated Projects:
Kitan Development Project
   - Kitan Development Project - Sub Sea Equipment and Flowlines Installation
   - Kitan Development Project - Drilling Program
   - Kitan Development Project - FPSO Supply, Operations and Maintenance
   - Kitan Development Project - Sub Sea Equipment Supply

The provision of subsea production system including Management, Engineering, Procurement, Manufacturing and Testing of Subsea Completion Equipment Package including

  • Subsea Drilling System
  • Completion System such as Subsea Tree / Tubing Hanger
  • Topside mounted Subsea Control System including MCS, HPU, JTJB
  • Subsea Control Distribution System including SCM, UTA, SDU, SCM
  • Subsea Production Control Umbilical
  • Installation Workover Control System
  • Subsea Tie-in System

What will it take to become a supplier

  • O&G industry is an industry with stringent rules and regulations due to the nature of the work we do and under the watchful eyes of the industry governance bodies.
  • FMC, at times, will impose additional requirement on top of industrial standards where necessary.
  • In order to become a supplier to FMC, prospective supplier need to:
  • Registered as legal entity with proper adhesion to financial and taxation audit requirements
  • Have a Quality Management System and HSE Management System conforming to industrial and FMC standards
  • Needs to comply to industrial codes such as ISO 9001, 14001 18001 and API 6A, 17D; Norsok etc. depending on the scope of supply.
  • Have NDT (UT / RT) facility to support conforming to industrial requirements and, at times, additional FMC requirement.

    Definitions:

    Tier 1 - A functional unit or complete package i.e able to produce/supply ALL of the requirements.

    Tier 2 - A component or part of the package i.e able to produce/supply part or some of the requirements.

 

Points of Contact

Program/Project Manager - Sanjay Duggal

Project Sponsor - Nicholas Gillier



click to expand/contract Work Packages

Currently Listing 1 Work Packages:
Tier 1: Complete package or service for this work package required. Tier 2: Partial package or service for this work package allowed.
  Work Package
Status

Applications Open

Tier 1 Closes

Tier 2 Closes

PDF
Kitan Development Project - Subsea - General Opportunities Open 1 Jul 2010 5 Jul 2011 n/a